SOME TOPICS THAT WE COVER:
-
[3:00] - The impact of having multiple types of windows for installation
-
[3:15] - How the initial contractor was not set up for the task at hand, which resulted in parting ways with the job
-
[4:00] - Rebeka designed the windows too big for the powder coating, and how that affected the job
-
[5:30] - The mystery of the incorrect colour on the windows
-
[6:30] - How the mystery was solved due to the tinting machine!
-
[7:45] - As hard as it may be, how to work through the delays and not dwell on the issues when they arise
-
[10:13] - As a result of the issue, a lot of the other trades have been pushed back with flow-on effects. How has Rebeka dealt with this?
-
[13:00] - An issue that Kribashini had when a miscalculation meant that she was one whole box short of tiles that she needed
-
[16:00] - Think about the issues in the bigger picture - is it something you're going to be worried about in a year? If it's not - it's not that big of an issue.
-
[16:50] - How lonely it can be building, and what to do when you're feeling overwhelmed
-
[18:37] - The difference between big issues that need resolution, and little issues that can be brushed over, or changes made to account for them depending on the level of importance
-
[20:00] - Kribashini's decision matrix